Method for improving isolation of flow to completed perforated intervals
AssigneeBaker Hughes Incorporated
InventorsHarold Dean Brannon, Harold Gene Hudson, Scott Gregory Nelson, D.V. Satyanarayana Gupta
Life of this patent
Estimating the term…
Loading patent…
AssigneeBaker Hughes Incorporated
InventorsHarold Dean Brannon, Harold Gene Hudson, Scott Gregory Nelson, D.V. Satyanarayana Gupta
Estimating the term…
A method for building a plug in a horizontal wellbore using a fluid pill containing a suspended well treatment composite. The well treatment composite contains a core comprising at least one deformable particulate and at least one dissolvable diverter. At least a portion of the surface of the core is coated with at least one viscosifying polymer and at least one crosslinking agent. The fluid pill is pumped into the wellbore at the end of a fracturing treatment and the fluid pill may be displaced by a displacement fluid. The fluid pill may be diverted to an area of lower permeability by disassociating the dissolvable diverter from the core. The disassociated diverter blocks an area of higher permeability. The sized particle distribution of the diverter is sufficient to at least partially block the penetration of fluid into the high permeability zone. In the lower permeability zone, a thickened gel is formed by the in-situ reaction of the viscosifying polymer and crosslinking. Deformable particulates in the gelled fluid form a bridge plug.
A method of building a plug in a horizontal wellbore which penetrates a subterranean formation, the method comprising:
A method of building a plug in a horizontal wellbore, the method comprising:
A method for building a plug in a horizontal wellbore comprising:
Dependencies are inferred from the claim text.