Systems and Methods for Selecting and Prioritizing Construction Checkpoints
AssigneeQuality Built, LLC
InventorStanley R. Luhr
Life of this patent
Estimating the term…
Loading patent…
AssigneeQuality Built, LLC
InventorStanley R. Luhr
Estimating the term…
A computer-based system uses information about a building project to select from a repository of construction checkpoints a subset of the checkpoints that are relevant to improving a building's safety, durability and comfort and to reducing financial risk. The checkpoints are prioritized based on at least one of: project geographic location, project-specific exposure, type of structure, complexity of building components, product quality, builder's repeated deficiencies, and codes and specifications. The system can be configured to use information about a current stage of construction of the building project to provide an inspector with checkpoints relevant to the current stage of construction. The system can be configured to prioritize selected checkpoints based on an assessment of financial risk posed by improper installation or construction of the checkpoints. Checkpoints that do not pass inspection are tracked until repaired. Repair records are stored to allow verification that the error was repaired.
1-14. (canceled)
In a computer system that implements a repository of construction checkpoints, a method of selecting a subset of the construction checkpoints for guiding an inspection associated with constructing a building project, the method comprising the computer-implemented steps of:
Dependencies are inferred from the claim text.