Method for redundantly controlling processes of an automation system
OwnerEduard Erhardt, Wilhelm Griesbauminventors
Life of this patent
Estimating the term…
Loading patent…
OwnerEduard Erhardt, Wilhelm Griesbauminventors
Estimating the term…
A method is provided for redundantly controlling process of an automation system having at least two controllers in which each controller consecutively carries out a plurality of task blocks, wherein output data which can be transmitted for carrying out the task blocks is stored in a plurality of work regions exceeding the number of task blocks by one. The work regions contain the respective output data for each of the task blocks. The one additional work region, which is the system work region, contains the output data. The method includes transferring the respective previously synchronized content from the system work region into the work region during the start of a task block in the redundant controllers, updating the content while task block is carried out and, if the updated content is identical, then returning the updated content to the system work region again before the next task block is started.
1-8. (canceled)
A method for redundantly controlling processes of an automation system which comprises at least two control units, wherein each control unit performs a plurality of task blocks one after another, wherein for execution of the task blocks, output data which can be transmitted are stored in a plurality of work regions which exceeds by one the number of task blocks, the respective work regions each containing the output data for each of the task blocks, wherein the one additional work region, which is the system work region, contains the output data which can currently be transmitted and for execution of a task block is used in each of the control units, the method comprising:
Dependencies are inferred from the claim text.