System and method for overload control in a next generation network
AssigneeTelefonaktiebolaget L M Ericsson (publ)
InventorsIstván Szabó, Daniel Krupp, Áron Szentesi, Ian Broadhurst
Life of this patent
Estimating the term…
Loading patent…
AssigneeTelefonaktiebolaget L M Ericsson (publ)
InventorsIstván Szabó, Daniel Krupp, Áron Szentesi, Ian Broadhurst
Estimating the term…
A Call Server in a network is able to monitor an offered rate of incoming calls per Access Gateway (AGW). A calculated GlobalLeakRate can be distributed between the AGWs in proportion to the traffic rate they offer. A leak rate calculation method is used to calculate the GlobalLeakRate control parameter of the ETSI NR restrictor at an overloaded Control Server The leak rate calculation is based on the POTS call rejection rate. In one particular embodiment of the present invention, the calculation is based on bringing the call reject rate close to a configurable low target reject level. An MGC is able to identify the end of an overload event with a greater degree of confidence and an AGW is able respond appropriately if the AGW is prematurely instructed to stop the control.
1-24. (canceled)
A method of controlling traffic demand at a control node in a network, the method comprising:
A method of controlling traffic demand at an access node in a network during an overload condition, the method comprising:
A control node for controlling traffic at access nodes in a network, the control node being operable to perform steps comprising:
An access node for providing access to a network for one or more subscribers, the access node being operable to perform steps comprising:
Dependencies are inferred from the claim text.