Method for producing a slab trackway
AssigneeSonneville AG
InventorsPeter Laborenz, Bruno Kiefer, Anabel Hengelmann
Life of this patent
Estimating the term…
Abstract
In order to produce a slab track for rail vehicles with an emergency pathway (12) for road vehicles, a prefabricated track section with rails (8) and sleepers (5) is supported and positioned on a substructure (1) by means of a supporting and aligning device (4). Subsequently, a track slab (10) is produced by casting in the sleepers (5). The part of the sleepers (5) that projects from the track slab (10) and the rails (8) are separated by formwork elements, and an emergency pathway (12) is applied to the track slab (10) by casting.
Claims13
Method for producing a slab track for rail vehicles with an emergency pathway for road vehicles wherein a prefabricated track section with rails and sleepers is supported and positioned on a substructure by means of a supporting and aligning device and a track slab is produced by casting in the sleepers, wherein the part of the sleepers that projects from the track slab and the rails are separated by formwork elements and an emergency pathway is applied to the track slab by casting.
Dependencies are inferred from the claim text.