Performance evaluation in a project management system
OwnerSteeve Teong Sin KAYinventor
Life of this patent
Estimating the term…
Loading patent…
OwnerSteeve Teong Sin KAYinventor
Estimating the term…
A project management system includes a project processor configured to receive information about a project, wherein the information includes subtasks for the project and information about an entity assigned to complete at least one subtask of the project; calculate expected outcomes for the project based on the subtasks for the project and the information about the entity, wherein the expected outcomes include at least one subtask expected outcome; receive realized outcomes of the project after it is realized, wherein the realized outcomes includes at least one subtask realized outcome; determine feedback for the project based on the at least one subtask realized outcome in relation to at least one the subtask expected outcome; generate a performance evaluation for the entity assigned to complete the at least one subtask of the project based on feedback for the project; and publish the performance evaluation for the entity.
A project management system comprising:
A method of providing performance evaluations in a project management system, the project management system comprising a project processor, the method comprising:
A non-transitory machine-readable medium comprising instructions stored therein, which when executed by a processor, cause the processor to perform operations comprising:
Dependencies are inferred from the claim text.