Scheduler, multi-core processor system, and scheduling method
AssigneeFujitsu Limited
InventorsTakahisa SUZUKI, Koichiro Yamashita, Hiromasa Yamauchi, Koji Kurihara
Life of this patent
Estimating the term…
Loading patent…
AssigneeFujitsu Limited
InventorsTakahisa SUZUKI, Koichiro Yamashita, Hiromasa Yamauchi, Koji Kurihara
Estimating the term…
In an embodiment, a scheduler coordinates timings at which cores execute processes, for any two sequential processes to consecutively be executable. The processes are executed in order scheduled by the scheduler by concentrating on a specific core processes obstructing the consecutive execution such as an external interrupt and an internal interrupt. The scheduler does not always cause processes of another application to be executed during all standby time periods while the scheduler determines whether a length of a standby time period is shorter than a predetermined value, and does not cause any process of the other application to be executed when the length is shorter than that.
A scheduler causing a specific core in a multi-core processor to execute a process comprising:
A multi-core processor system comprising a core configured to:
A scheduling method executed by a specific core in a multi-core processor, the scheduling method comprising:
Dependencies are inferred from the claim text.