Abstract
An object is to prevent overload on a shared resource. In an information processing system including a resource possibly shared between a plurality of work loads, an additional load is applied to the resource while operating the work loads, and the performances of the work loads are monitored.
Claims13
An operation management method for an information processing system including a first resource connected to a first information processing apparatus and to a second information processing apparatus, wherein:
- an operation management computer of the information processing system applies an additional load to the first resource while operating a first combination of work loads including a first work load and a second work load in which the first work load is operated on the first information processing apparatus and the second work load is operated on the second information processing apparatus;
- and
- the operation management computer performs first monitoring on performance of at least one of the first work load and the second work load.
An operation management method for an information processing system including a resource possibly shared between work loads, wherein:
- an operation management computer of the information processing system applies an additional load to the resource while operating a first work load in the information processing system;
- and
- the operation management computer performs first monitoring on performance of the first work load.
An information processing system including a first resource connected to a first information processing apparatus and to a second information processing apparatus, the system comprising:
- an operation management computer configured to apply an additional load to the first resource while operating a first combination of work loads including a first work load and a second work load in which the first work load is operated on the first information processing apparatus and the second work load is operated on the second information processing apparatus, and perform first monitoring on performance of at least one of the first work load and the second work load.
Dependencies are inferred from the claim text.