Dynamic resource adaptation
AssigneeSap SE
InventorsAndreas Meier, Martin Kaiser
Life of this patent
Estimating the term…
Abstract
A system may include determination of historical resource load information associated with an enterprise computing system, determination of resource needs of the enterprise computing system associated with a future time based on the historical resource load information, and, at the future time, automatic allocation and de-allocation of resources to the enterprise computing system based on the determined resource needs.
Claims18
A method implemented by a computing system in response to execution of program code by a processor of the computing system, the method comprising:
- determining historical resource load information associated with an enterprise computing system;
- determining resource needs of the enterprise computing system associated with a future time based on the historical resource load information;
- and
- at the future time, automatically allocating resources to the enterprise computing system based on the determined resource needs.
A non-transitory medium storing processor-executable program code, the program code executable by a device to:
- determine historical resource load information associated with an enterprise computing system;
- determine resource needs of the enterprise computing system associated with a future time based on the historical resource load information;
- and
- at the future time, automatically allocate resources to the enterprise computing system based on the determined resource needs.
A system comprising:
- a computing device comprising:
- a memory storing processor-executable program code;
- and
- a processor to execute the processor-executable program code in order to cause the computing device to:
- determine historical resource load information associated with an enterprise computing system;
- determine resource needs of the enterprise computing system associated with a future time based on the historical resource load information;
- and
- at the future time, automatically allocate resources to the enterprise computing system based on the determined resource needs.
Dependencies are inferred from the claim text.