Systems and methods for testing emergency power supply systems
AssigneeBlue Pillar, Inc.
InventorsBradley Jay Witter, Thomas Joseph Butler, Joseph J. Scoufis, Eric D. Reichel
Life of this patent
Estimating the term…
Loading patent…
AssigneeBlue Pillar, Inc.
InventorsBradley Jay Witter, Thomas Joseph Butler, Joseph J. Scoufis, Eric D. Reichel
Estimating the term…
Aspects of the present disclosure generally relate to systems and methods for managing and monitoring a plurality of emergency power supply systems (EPSS's) at a facility via an emergency power management system (EPMS). The EPMS generally comprises EPSS equipment, a management computer system for managing, monitoring, and testing the operational characteristics of the EPSS equipment, and a plurality of interface modules for providing unified communication capabilities between the management computer system and the EPSS equipment. Additional aspects relate to methods for easily and efficiently creating and installing an EPMS at a facility. Further aspects are directed to providing predictive analyses related to the EPSS equipment. Also, aspects of the present disclosure relate to normalizing EPSS equipment information across varying vendors, makes, and models of equipment so as to provide a unified view of all equipment across a given facility.
1-115. (canceled)
A method for testing emergency power supply system (EPSS) equipment at a facility, wherein the EPSS equipment comprises at least one automatic transfer switch (ATS), and wherein the EPSS equipment is operatively connected to an EPSS management computer system for managing the EPSS equipment, comprising the steps of:
The method of claim DM1, wherein the one or more items of EPSS equipment further comprises at least one generator.
A method for testing emergency power supply system (EPSS) equipment at a facility, wherein the EPSS equipment comprises at least one automatic transfer switch (ATS), and wherein the EPSS equipment is operatively connected to an EPSS management computer system for managing the EPSS equipment, comprising the steps of:
A method for testing emergency power supply system (EPSS) equipment at a facility, wherein the EPSS equipment comprises at least one generator, and wherein the EPSS equipment is operatively connected to an EPSS management computer system for managing the EPSS equipment, comprising the steps of:
A method for utilizing an emergency event as a load test for purposes of complying with testing requirements involving the operation of emergency power supply system (EPSS) equipment at a facility, wherein the EPSS equipment is operatively connected to an EPSS management computer system for managing the EPSS equipment at the facility, comprising the steps of:
For an emergency power supply system (EPSS) that supplies emergency electrical power to a protected facility in the event of a power outage of electrical power by a utility, a method for maintaining equipment of the EPSS in a state of compliance with requirements involving the operation of the EPSS equipment under predetermined conditions for predetermined times, the EPSS equipment comprising at least one generator and at least one automatic transfer switch (ATS), comprising the steps of:
Dependencies are inferred from the claim text.