Method for optimizing power consumption in planned projects
AssigneeInternational Business Machines Corporation
InventorsBarry Alan Kritt, Sarbajit K. Rakshit
Life of this patent
Estimating the term…
Abstract
Automatically accesses, from a database, the rate of power consumption of each object on a displayed list and automatically calculating the power consumption of each object over a planned period time of use of the object. Then, during actual use, the actual power consumption of each object on the list is automatically tracked over the planned period of time of use and the difference between the planned and actual power consumption of each object on the list is automatically calculated. The difference for each object on the list is displayed so that the user may take action interactively.
Claims8
A computer controlled interactive display method for optimizing power consumption in a planned project comprising:
- storing in a database rates of power consumption of a plurality of objects;
- entering a list of power consuming objects planned to be in said planned project on an interactive display;
- entering on said display, the planned period of time of use of each object on said list;
- automatically accessing from said database, the rate of power consumption of each object on said list;
- automatically calculating the power consumption of each object on said list over the planned period time of use of said object;
- automatically tracking the actual power consumption of each object on said list over said planned period of time of use;
- automatically calculating the difference between the planned and actual power consumption of each object on said list;
- and
- displaying said difference for each object on said list.
8-21. (canceled)
Dependencies are inferred from the claim text.