Method of optimising a wind park construction
OwnerSoeren E. Nielseninventor
Life of this patent
Estimating the term…
Abstract
A method of optimising a wind park construction is provided. The wind park includes at least a first wind turbine and a second wind turbine. According to the method, a first blade topology is selected for the first wind turbine depending on a noise optimisation parameter which is measured and/or predicted at a reference position at a distance from the wind park. A second blade topology is selected for the second wind turbine depending on an energy efficiency optimisation parameter.
Claims11
A method of optimising a wind park construction, the wind park comprising at least a first wind turbine and a second wind turbine, the method comprising:
- selecting a first blade topology for the first wind turbine depending on a noise optimisation parameter which is measured and/or predicted at a reference position at a distance from the wind park, and
- selecting a second blade topology for the second wind turbine depending on an energy efficiency optimisation parameter.
A wind turbine for a wind park, comprising:
- a plurality of blades with trailing edges which can be optimized according to at least a first blade topology and a second blade topology,
- wherein the first blade topology relates to a noise optimisation parameter which is measured and/or predicted at a reference position at a distance from the wind park, and
- wherein the second blade topology relates to an energy efficiency optimisation parameter.
A wind park, comprising:
- a first wind turbine and a second wind turbine, wherein
- a first blade topology is selected for the first wind turbine depending on a noise optimisation parameter which is measured and/or predicted at a reference position at a distance from the wind park, and
- a second blade topology is selected for the second wind turbine depending on an energy efficiency optimisation parameter.
Dependencies are inferred from the claim text.