Power supply contoller
AssigneesAutonetworks Technologies, Ltd., Sumitomo Wiring Systems, Ltd., Sumitomo Electric Industries, Ltd.
InventorsSeiji Takahashi, Masayuki Kato, Masahiko Furuichi
Life of this patent
Estimating the term…
Abstract
A second forcing shutoff operation is performed for a power MOSFET 15 and the like, if a time when a load current (or a sense current Is) passing on a power supply line L exceeds a first threshold current Ia reaches a first reference time. On the other hand, the count value of a fuse time counter 71 is cleared to be “zero” so that the shutoff operation for the power MOSFET 15 and the like is not performed, if a normal state, in which neither an overcurrent nor a fuse current has occurred, continues for a second reference time without the first reference time being reached.
Claims22
1-21. (canceled)
A power supply controller for controlling power supply from a power source to a load, comprising:
- a semiconductor switching element disposed on a power supply line from said power source to said load;
- a current detecting element configured to detect a load current passing through said semiconductor switching element;
- a first abnormal current detecting circuit configured to determine, based on a detection signal from said current detecting element, whether a load current passing through said semiconductor switching element exceeds a first threshold, and further configured to output a first abnormal current signal if said load current exceeds said first threshold;
- an anomaly time accumulator circuit configured to start accumulation of an anomaly time if said first abnormal current detecting circuit outputs said first abnormal current signal, and further configured to initiate a first shutoff operation for said semiconductor switching element when said anomaly time reaches a first reference time;
- a normal duration accumulator circuit configured to output a clear signal when a normal duration, during which said load current is continuously maintained lower than said first threshold, reaches a second reference time after said anomaly time accumulator circuit starts the accumulation;
- and
- an anomaly time clear circuit configured to clear said anomaly time of said anomaly time accumulator circuit based on an output of said clear signal.
Dependencies are inferred from the claim text.