Configuration facility for the configuration of a time-triggered bus system
AssigneedSPACE digital signal processing and control engineering GmbH
InventorsKai Brinksmeier, Ralf Stolpe, Nico Loose
Life of this patent
Estimating the term…
Loading patent…
AssigneedSPACE digital signal processing and control engineering GmbH
InventorsKai Brinksmeier, Ralf Stolpe, Nico Loose
Estimating the term…
A configuration facility is presented and specified, with at least one computer unit and a display device for the configuration of a time-triggered bus system. The bus system has at least two bus nodes and a data bus connecting the bus nodes. At least one node task and at least one transmission task can be executed at the bus nodes. The node tasks can be presented in time sequence in a node task field, the transmission tasks can be presented in time sequence in a transmission task field separate from the node task field, and the node tasks and the transmission tasks can be coordinated with each other by graphic allocation.
A configuration facility for the configuration of a time-triggered bus system, wherein the bus system has at least two bus nodes and a data bus coupling the bus nodes, wherein at node task and at least one transmission task can be executed at the bus nodes and wherein the at least one node task and the at least one transmission task can be presented in time sequence, scheduled in time and coordinated with each other by the configuration facility in the course of the configuration and at least one node task program and at least one transmission task program can be created on the basis of the configuration performed, such that the node task and the transmission task can be implemented at the bus nodes,
A method for creating at least one node task program and at least one transmission task program for a time-triggered bus system, wherein the bus system has at least two bus nodes and a data bus coupling the bus nodes, wherein one node task can be implemented with the node task program at a bus node, and wherein at least one transmission task can be implemented with the transmission task program at one of the bus nodes, wherein the node tasks and the transmission tasks are first scheduled relative to each other, presented and coordinated with each other by a configuration of the bus system,
Dependencies are inferred from the claim text.