Operation timing verifying apparatus and program
AssigneeOki Semiconductor Co., Ltd.
InventorShigekiyo AKUTSU
Life of this patent
Estimating the term…
Loading patent…
AssigneeOki Semiconductor Co., Ltd.
InventorShigekiyo AKUTSU
Estimating the term…
An operation timing verifying apparatus and program for accurately verifying operation timings of a semiconductor integrated circuit in design with suppressing design time and cost. The operation timing verifying apparatus and program sets an unreal corner condition that all delay elements present a maximum delay as an operating condition, performs operation timing analysis in the operating condition, thereby extracting an operation-violating circuit path, if any, from a circuit layout, sets a real corner condition that at least one element type of delay elements from among the delay elements present a maximum delay as the operating condition and performs the operation timing analysis on only the operation-violating circuit path to determine again whether an operation violation exists therein.
An operation timing verifying apparatus which reads in circuit data representing a circuit layout including a plurality of delay elements and performs operation timing analysis in a settable operating condition on said circuit layout, comprising:
An operation timing verifying program for making a computer to function as means to read in circuit data representing a circuit layout including a plurality of delay elements and to perform an operation timing analysis in a settable operating condition on said circuit layout, said verifying program comprising:
An operation timing verifying method for making a computer to function as means to read in circuit data representing a circuit layout including a plurality of delay elements and to perform an operation timing analysis in a settable operating condition on said circuit layout, said operation timing verifying method comprising;
A system for verifying an operation timing comprising a computer and an operation verifying program for making the computer to function as means to read in circuit data representing a circuit layout including a plurality of delay elements and to perform an operation timing analysis in a settable operating condition on said circuit layout, said operation timing verifying program comprising:
An operation timing verifying program product comprising a operation timing verifying program for making a computer to function as means to read in circuit data representing a circuit layout including a plurality of delay elements and to perform an operation timing analysis in a settable operating condition on said circuit layout, said operation timing verifying program comprising:
Dependencies are inferred from the claim text.