Apparatus And Method For An Autonomous Robotic System For Performing Activities In A Well
AssigneeIntelligent Robotic Corporation
InventorsNeil De Guzman, Lawrence Lafferty, Chad Lafferty, Donald K. Steinman
Life of this patent
Estimating the term…
Loading patent…
AssigneeIntelligent Robotic Corporation
InventorsNeil De Guzman, Lawrence Lafferty, Chad Lafferty, Donald K. Steinman
Estimating the term…
An autonomous robot performs maintenance and repair activities in oil and gas wells, and in pipelines. The robot uses the well and pipeline fluids to provide most of the energy required for its mobility, and to charge a turbine from which it may recharge batteries or power a motor for additional propulsion. A control system of associated systems controls the robot, enabling the robot to share plans and goals, situations, and solution processes with wells, pipelines, and external control systems. The control system includes decision aids in a series of knowledge bases that contain the expertise in appropriate fields to provide intelligent behavior to the control system. The intelligent behavior of the control system enables real time maintenance management of wells and pipelines, through actively collecting information, goal-driven system, reasoning at multiple levels, context sensitive communication, activity performing, and estimation of the operators' intent.
A downhole robotic tool for managing, controlling, and servicing a completed well, the tool comprising:
The tool of claim 5, wherein the tool further comprises a layered system that defines the interactions between the tool and its environment.
The tool of claim 6, wherein the plan goal graphs represent knowledge of the tool required to manage wells, fiber optic smart wells, and electronic fields.
The tool of claim 7, wherein dynamic planning through a life cycle of planned activities enables changing of plans in response to changing circumstances.
The tool of claim 8, wherein the well is an oil well.
The tool of claim 8, wherein the well is a gas well.
The tool of claim 8, wherein the well is a multi-lateral well.
Dependencies are inferred from the claim text.