Method of controlling torque applied to a tubular connection
AssigneeWeatherford/Lamb, Inc.
InventorsGraham Ruark, Merlin Perry, Aaron Dauphine
Life of this patent
Estimating the term…
Abstract
Embodiments of the present invention generally relate to a method for controlling the torque applied to a tubular connection. In one embodiment, a method of connecting a first threaded tubular to a second threaded tubular supported by a spider on a drilling rig includes engaging the first threaded tubular with the second threaded tubular; making up the connection by rotating the first tubular using a top drive; and controlling unwinding of the first tubular after the connection is made up.
Claims6
A method of connecting a first threaded tubular to a second threaded tubular supported by a spider on a drilling rig, comprising:
- engaging the first threaded tubular with the second threaded tubular;
- making up the connection by rotating the first tubular using a top drive;
- and
- controlling unwinding of the first tubular after the connection is made up.
A system for connecting threaded tubular members for use in a wellbore, comprising:
- a top drive operable to rotate a first threaded tubular relative to a second threaded tubular;
- and
- a controller operably connected to the top drive, and comprising:
- a torque gage;
- a turns sensor;
- and
- a computer operable to receive torque measurements taken by the torque gage and rotation measurements taken by the turns sensor;
- wherein the computer is configured to perform an operation, comprising:
- engaging the first tubular with the second tubular;
- making up the connection by rotating the first threaded tubular;
- and
- controlling unwinding of the first tubular after the connection is made up.
A method of connecting a first threaded tubular to a second threaded tubular supported by a spider on a drilling rig, comprising:
- engaging the first tubular with the second tubular;
- making up the connection by rotating the first threaded tubular using a top drive;
- and
- substantially decreasing a rotational speed of the top drive at or after the connection is substantially made up and before the connection is completely made up.
A method of connecting a first threaded tubular to a second threaded tubular supported by a spider on a drilling rig, comprising:
- engaging the first tubular with the second tubular;
- making up the connection by rotating the first threaded tubular using a top drive;
- and
- during rotation of the first tubular:
- measuring torque applied by the top drive;
- determining angular acceleration of the top drive and/or the first tubular;
- determining inertial torque of the top drive and/or the first tubular using the angular acceleration;
- and
- compensating the torque measurement using the inertial torque of the top drive and/or the first tubular.
Dependencies are inferred from the claim text.