Back to results
US 2009/0045863 A1Published application
System and method for removal of frequency-dependent timing distortion
AssigneeWavecrest Corporation
InventorsSteve McCoy, John David Hamre
Life of this patent
Estimating the term…
Abstract
A method of preparing a signal for measurement includes receiving the signal and selecting a first edge and a second edge within the signal. The method also includes delivering the first edge to a time interval measurement system after expiration of a first delay period and delivering the second edge to a time interval measurement system after expiration of a second delay period.
Claims20
A method of preparing a signal for measurement, the method comprising:
- receiving the signal;
- selecting a first edge within the signal;
- selecting a second edge within the signal;
- delivering the first edge to a time interval measurement system after expiration of a first delay period;
- and
- delivering the second edge to a time interval measurement system after expiration of a second delay period.
3 more elements
A system for measurement of a time interval, the system comprising:
- a first edge selection circuit configured to receive a signal, to select a first transition within the signal, said selection occurring over a first span of time, and to deliver the first selected transition to a first state device upon elapsing of the first span of time;
- a second edge selection circuit configured to receive the signal, to select a second transition within the signal, said selection occurring over a second span of time, and to deliver the second selected transition to a second state device upon elapsing of the first span of time;
- a first delay element configured to deliver a pulse to the first state device at a point in time following the elapsing of the first span of time, so that the first state device assumes a state determined by the first selected transition;
- and
- a second delay element configured to deliver a pulse to the second state device at a point in time following the elapsing of the second span of time, so that the second device assumes a state determined by the second selected transition.
2 more elements
A method of preparing a signal for measurement, the method comprising:
- a) receiving the signal;
- b) selecting a first edge within the signal;
- c) selecting a second edge within the signal;
- d) delivering the first edge to a time interval measurement system after expiration of a first delay period;
- and
- e) delivering the second edge to a time interval measurement system after expiration of the first delay period.
3 more elements
Dependencies are inferred from the claim text.