Method and system for construction document management and distribution
OwnerJack Longinventor
Life of this patent
Estimating the term…
Abstract
A method for processing an order for construction document printing comprising receiving a first printing request, wherein the request is comprised of one or more documents that must be printed for one or more users; determining an address associated with each of the one or more users; determining a closest printing facility for each of the one or more users; and sending a second printing request to the closest printing facility for printing the one or more documents associated with each of the one or more users.
Claims10
A method for online collaboration in a construction document management system, the method comprising:
- a) displaying one or more construction professionals to select from for potential association with a construction project;
- b) selecting one or more of the construction professionals to receive a notification to become members of the construction project;
- c) sending an electronic notification to the one or more construction professionals inviting them to access the online administration of the construction project;
- and
- d) receiving confirmation from the one or more construction professionals specifying acceptance or rejection of the invitation.
A method for online collaboration in a construction document management system, the method comprising:
- a) specifying contact information for one or more construction professionals to be invited to join a construction project;
- b) sending an electronically transmitted notification to the one or more construction professionals;
- and
- c) receiving confirmation from the one or more construction professionals specifying acceptance or rejection of the invitation.
A method for construction document distribution, the method comprising:
- a) placing an order online for one or more construction documents that are to be distributed to one or more construction professionals associated with a construction project;
- b) determining the closest printing facility for each of the one or more construction professionals;
- c) processing the order by transmitting the order information to the closest printing facility for each of the one or more construction professionals;
- and
- d) preparing printouts of the construction documents for the one or more construction professionals.
A method for processing an order for construction document printing comprising:
- a) receiving a first printing request, wherein the request is comprised of one or more documents that must be printed for one or more users;
- b) determining an address associated with each of the one or more users;
- c) determining a closest printing facility for each of the one or more users;
- and
- d) sending a second printing request to the closest printing facility for printing the one or more documents associated with each of the one or more users.
Dependencies are inferred from the claim text.