Offline at start up of a powered on device
AssigneeTexas Instruments Incorporated
InventorGary L. Swoboda
Life of this patent
Estimating the term…
Abstract
A method comprises a system comprising a host device coupled to a first remote device actively operating according to a state diagram that the host device and all remote devices follow during operation of the system. The method further comprises powering up a second remote device while the host device and first remote device are actively operating according to the state diagram. The second remote device determines whether to initialize to a standard protocol or to an advanced protocol. Upon determining to initialize to the advanced protocol, the second remote device then waits for a synchronization point sequence.
Claims11
A method, comprising:
- a system comprising a host device coupled to a first remote device actively operating according to a state diagram that the host device and all remote devices follow during operation of the system;
- powering up a second remote device while the host device and first remote device are actively operating according to the state diagram;
- the second remote device determining whether to initialize to a standard protocol or to an advanced protocol;
- and
- upon determining to initialize to the advanced protocol, the second remote device then actively waiting to detect a synchronization point sequence.
A device, comprising:
- an adapter that contains a first test access port (TAP) controller;
- and
- scan test logic (STL) coupled to the adapter, the scan test logic contains a second TAP controller;
- wherein, upon powering up, the first TAP controller transitions to an idle state, causes the STL to be decoupled, and monitors a system for a synchronization point sequence;
- wherein the system comprises a debug test system (DTS) coupled to and, while the device is powering up, actively communicating with at least one target system (TS) in accordance with a system-wide state diagram.
A system, comprising:
- a debug test system (DTS) that coordinates testing activities;
- a first target system (TS) coupled to the DTS via a shared bus and tested by the DTS;
- and
- a second TS coupled to the DTS via said shared bus;
- wherein the DTS provides a synchronization point sequence on said shared bus that causes said first and second TS's to implement a predetermined feature set;
- and
- wherein the second TS detects the synchronization point sequence after powering on and while in an idle state waiting for the synchronization point sequence;
- and
- wherein the system operates according to a system state diagram in which the DTS and all TS's follow the same states at the same time.
Dependencies are inferred from the claim text.