Heating tar sands formations while controlling pressure
AssigneeShell Oil Company
InventorsGeorge Leo Stegemeier, Gary Lee Beer, Etuan Zhang
Life of this patent
Estimating the term…
Loading patent…
AssigneeShell Oil Company
InventorsGeorge Leo Stegemeier, Gary Lee Beer, Etuan Zhang
Estimating the term…
Methods for treating a tar sands formation are described herein. Methods may include heating at least a section of a hydrocarbon layer in the formation from a plurality of heaters located in the formation. A pressure in the majority of the section may be maintained below a fracture pressure of the formation. The pressure in the majority of the section may be reduced to a selected pressure after the average temperature reaches a temperature that is above 240° C. and is at or below pyrolysis temperatures of hydrocarbons in the section. At least some hydrocarbon fluids may be produced from the formation.
1-1112. (canceled)
A method for treating a tar sands formation, comprising:
1122-1684. (canceled)
Dependencies are inferred from the claim text.