Project status calculation algorithm
AssigneeInternational Business Machines Corporation
InventorsJoseph R. Rafter, Russell W. Taylor, Vito R. Vitale
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsJoseph R. Rafter, Russell W. Taylor, Vito R. Vitale
Estimating the term…
Disclosed are a method and system for assessing the status of a project that remove subjectivity from the status reporting by implementing an algorithm to calculate red, yellow, green status of each of a multitude of keys and the overall project. The assessment uses a series of questions based on risk management, project management, system engineering, architecture, and testing disciplines to probe projects and solicit objective responses with scores and a conversion of the score into a red, yellow, green status. The advantage to this solution is that a consistent standard is provided, eliminating the accidental or purposeful exclusion of key details in status reporting that frequently result in a more optimistic status than what reality should reflect.
A method of assessing the status of a project, comprising the steps of:
Dependencies are inferred from the claim text.