Method of rebuilding a viaduct without interrupting service on the old structure
OwnerJames M. Powersinventor
Life of this patent
Estimating the term…
Loading patent…
OwnerJames M. Powersinventor
Estimating the term…
A method of rebuilding a viaduct without interrupting service on the old structure by over topping it with a new, higher viaduct well above existing traffic, includes the following: Erecting new span supporting columns arrayed along either side of the old viaduct. New columns are temporarily connected to old viaduct to strengthen it for a temporary scaffold role transporting heavy subassemblies into position atop the new columns. The subassemblies or their components would typically arrive at a staging area alongside the old viaduct for preparation and hoisting the subassemblies onto a high dolly atop the old viaduct. The subassemblies are assembled into spans on the high dolly atop the old viaduct roadbed surface to transport and position the spans sequentially onto respective columns beginning with columns at extreme ends of the old viaduct and successively hoisting and transporting more subassemblies until a new higher viaduct roadbed is assembled well over the still functioning old viaduct.
A method of rebuilding an elevated roadway or viaduct without interrupting service on the old viaduct by over topping it with a new, higher viaduct above existing traffic, comprising the steps of:
A method of rebuilding an old viaduct without interrupting service on the structure by building a new, higher viaduct directly above said old viaduct, above existing traffic, comprising the steps of:
A method of launching spans of a new viaduct erected above an old viaduct beyond the ends of said old viaduct without interrupting service on the old viaduct as a means to lengthen the viaduct or to launch a roadbed transition ramp to lower or to raise the said new viaduct roadbed path to the roadbed continuing beyond the old viaduct roadbed, comprising the steps of:
Dependencies are inferred from the claim text.