Very large vessel construction
AssigneeSingle Buoy Moorings Inc.
InventorsAdam F. J. M. Lambregts, Bram Van Cann, Sjoerd Maarlen Hendriks, Leendert Poldervaart
Life of this patent
Estimating the term…
Loading patent…
AssigneeSingle Buoy Moorings Inc.
InventorsAdam F. J. M. Lambregts, Bram Van Cann, Sjoerd Maarlen Hendriks, Leendert Poldervaart
Estimating the term…
A very large hydrocarbon production vessel (10) of at least 40,000 tons steel weight, is constructed without requiring a very long reserve time period in a very large dry dock. The hull of the vessel is constructed in at least three different hull sections, including a midship hull section (24) and bow and stern hull sections (20, 22), with each preferably constructed at a different construction site. The hull sections are then brought together in a very large dry dock and welded together, so a minimum amount of time must be reserved in the very large dry dock. The midship hull section is preferably constructed in a specialized shipyard, and the same shipyard installs drilling equipment (50) and equipment that connects to risers that bring up hydrocarbons, so the expertise of the shipyard is used for both the midsection hull construction and specialized drilling and riser handling equipment.
A method for at least constructing a very large hydrocarbon production vessel of at least 40,000 tons of steel weight which has a hull and equipment on the hull, the hull having a plurality of hull sections including bow and stern end sections and having a midship section for lying between the bow and stern sections, wherein one of the sections includes a riser coupling for connecting to a riser extending to a seafloor reservoir, and wherein said hull sections are each constructed by fastening together large steel plate sections, comprising:
A large hydrocarbon production vessel of at least 40,000 tons steel weight, comprising:
Dependencies are inferred from the claim text.