Method of allocating radio resource
AssigneeLG Electronics Inc.
InventorChang Keun Seo
Life of this patent
Estimating the term…
Abstract
A method of allocating a radio resource for a traffic burst is disclosed. The method includes the steps of selecting at least one cell having a pilot signal strength that is greater than a pilot signal strength of a primary cell, requesting a communication resource reservation to the selected cells, receiving results of reservation performed according to the reservation request from the selected cells, and requesting allocation of the communication resource to the cells that secure a maximum data rate by analyzing the results of reservation.
Claims17
A method of allocating a radio resource comprising the steps of:
- selecting at least one cell having a pilot signal strength that is greater than a pilot signal strength of a primary cell;
- requesting a communication resource reservation to the selected cells;
- receiving results of reservation performed according to the reservation request from the selected cells;
- and
- requesting allocation of the communication resource to the cells that secure a maximum data rate by analyzing the results of reservation.
A method of allocating a radio resource in a communication system including a plurality of mobile stations and at least one base station that performs a radio connection of the mobile stations, the method comprising the steps of:
- having data to be newly transmitted selecting at least one target base station having a pilot signal strength that is greater than a reference pilot signal strength at a source base station;
- requesting a communication resource reservation to the selected target base stations through a burst request message at the source base station;
- reserving the communication resource according to the reservation request, and reporting results of reservation to the source base station as a response message to the burst request message at the target base stations;
- and
- analyzing the results of reservation, and requesting allocation of the communication resource to the target base stations that secure a maximum data rate through a burst commit message at the source base station.
Dependencies are inferred from the claim text.