Double sleeper for getrac A3 fixed track
AssigneePfleiderer Infrastrukturtechnik GmbH & Co. KG
InventorsWinfried Mohr, Gerhard Berns, Gundolf Spitzner
Life of this patent
Estimating the term…
Loading patent…
AssigneePfleiderer Infrastrukturtechnik GmbH & Co. KG
InventorsWinfried Mohr, Gerhard Berns, Gundolf Spitzner
Estimating the term…
A railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac A3 construction with a dowel stone, which is inserted in a recess and which, reaching over the railroad tie and protruding downward, engages a cavity pocket of the asphalt track. The railroad tie is constructed as a double railroad tie, which forms only a narrow gap with the adjacent railroad tie in order to make radial laying (curve) possible and which is provided in the region of the dowel stone on the underside with lateral constrictions, so that the cavity pockets can be filled subsequently.
A railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac A3 construction with a dowel stone, which is inserted in a recess on the underside and which, reaching over the railroad tie and protruding downward, engages a cavity pocket of the asphalt track, wherein the railroad tie is constructed as a double railroad tie at (4), which forms only a narrow gap with the adjacent railroad tie in order to make radial laying (curve) possible and which is provided in the region of the dowel stone (7) on the underside with lateral constrictions (11, 12), so that the cavity pockets (10) can be filled subsequently.
Dependencies are inferred from the claim text.