Combined cycle power generation plant
AssigneeMitsubishi Heavy Industries, Ltd.
InventorsJUN YASURAOKA, KOUZO TOYAMA
Life of this patent
Estimating the term…
Abstract
A means detecting the flow of the steam at the gateway of the steam cooling system is provided, and the timing of the finish of the warm-up process of the steam cooling system at start-up is decided by the difference of the flow of the steam at the gateway. In case of the difference between the flow of the steam at the inlet and the flow of the steam at the outlet, of the steam cooling system, is below a permitted value, it is considered that residual air and drainage are not remained between the inlet and the outlet and the warming-up is finished, and running to the step for starting the gas turbine can be performed.
Claims2
A combined cycle power plant composed of a gas turbine plant and a steam turbine plant, comprising;
- an exhaust heat recovery boiler for generating steam driving said steam turbine by using the exhaust heat from said gas turbine, and a steam cooling system for cooling high temperature cooled parts of said gas turbine by steam;
- wherein super heated steam from said steam cooling system is returned to said steam turbine, and
- a means detecting the flow of the steam at the gateway of said steam cooling system is provided, and the timing of the finish of the warm-up process of said steam cooling system at start-up is detected by the difference of the flow of said steam at said gateway.
A combined cycle power plant composed of a gas turbine plant and a steam turbine plant, comprising;
- an exhaust heat recovery boiler for generating steam driving said steam turbine by using the exhaust heat from said gas turbine, and
- a steam cooling system for cooling high temperature cooled parts of said gas turbine by steam;
- wherein super heated steam from said steam cooling system is returned to said steam turbine, and
- a means detecting the temperature of the steam at the outlet of said steam cooling system is provided, and the timing of the finish of the warm-up process of said steam cooling system at start-up is decided by the detected temperature of said steam at said outlet.
Dependencies are inferred from the claim text.