Scheduling method, base station and storage medium
AssigneeZte Corporation
InventorsYunpeng Zhang, Yusen Zhang, Tao Kang, Junli Yang
Life of this patent
Estimating the term…
Abstract
A scheduling method, a base station and a storage medium are disclosed. The scheduling method may include: sending uplink service scheduling information to a terminal device (S210); acquiring data information sent by the terminal device according to the uplink service scheduling information through a physical uplink shared channel (PUSCH) (S220); determining a layer number of uplink service scheduling according to the data information (S230); and scheduling an uplink service according to the layer number of uplink service scheduling (S240).
Claims20
A scheduling method, performed by an Air To Ground (ATG) ground base station, comprising:
- sending uplink service scheduling information to a an onboard ATG transceiver;
- acquiring data information sent by the onboard ATG transceiver according to the uplink service scheduling information through a physical uplink shared channel (PUSCH), wherein the data information comprises downlink service data information;
- obtaining a layer number of downlink service scheduling according to the downlink service data information in the data information;
- determining the layer number of downlink service scheduling as a layer number of uplink service scheduling;
- starting a timer;
- in a case of re-acquiring the data information sent by the onboard ATG transceiver according to the uplink service scheduling information through the PUSCH, in response to the timer having not timed out, determining the layer number of downlink service scheduling as the layer number of uplink service scheduling;
- and
- scheduling an uplink service according to the layer number of uplink service scheduling.
An Air To Ground (ATG) ground base station, comprising
- a memory, a processor, and a computer program stored in the memory and executable by the processor, wherein the computer program, when executed by the processor, causes the processor to perform a scheduling method comprising:
- sending uplink service scheduling information to an onboard ATG transceiver;
- acquiring data information sent by the onboard ATG transceiver according to the uplink service scheduling information through a physical uplink shared channel (PUSCH), wherein the data information comprises downlink service data information;
- obtaining a layer number of downlink service scheduling according to the downlink service data information in the data information;
- determining the layer number of downlink service scheduling as a layer number of uplink service scheduling;
- starting a timer;
- in a case of re-acquiring the data information sent by the onboard ATG transceiver according to the uplink service scheduling information through the PUSCH, in response to the timer having not timed out, determining the layer number of downlink service scheduling as the layer number of uplink service scheduling;
- and
- scheduling an uplink service according to the layer number of uplink service scheduling.
A non-transitory computer-readable storage medium, storing computer-executable instructions configured to cause a computer to perform a scheduling method performed by an Air To Ground (ATG) ground base station comprising:
- sending uplink service scheduling information to an onboard ATG transceiver;
- acquiring data information sent by the onboard ATG transceiver according to the uplink service scheduling information through a physical uplink shared channel (PUSCH), wherein the data information comprises downlink service data information;
- obtaining a layer number of downlink service scheduling according to the downlink service data information in the data information;
- determining the layer number of downlink service scheduling as a layer number of uplink service scheduling;
- starting a timer;
- in a case of re-acquiring the data information sent by the onboard ATG transceiver according to the uplink service scheduling information through the PUSCH, in response to the timer having not timed out, determining the layer number of downlink service scheduling as the layer number of uplink service scheduling;
- and
- scheduling an uplink service according to the layer number of uplink service scheduling.
Dependencies are inferred from the claim text.