Temporary suspension of completed hydrocarbon wells
AssigneeConocoPhillips Company
InventorsJan Ove Soerheim, Lars Albertsen, Rune Woie
Life of this patent
Estimating the term…
Loading patent…
AssigneeConocoPhillips Company
InventorsJan Ove Soerheim, Lars Albertsen, Rune Woie
Estimating the term…
In the process of suspending a subsea hydrocarbon well (1) after finalizing the completion operation and prior to stimulation of the well and putting the well on production, preinstalled upper and lower glass plugs (11, 12) are used as temporary barriers in the tubing. The plugs allow various tests to be performed before the lower plug (12), below the production packer (10), is broken; the upper plug (11) located above the downhole safety valve (13) then forms one of the barriers required to suspend the well whilst the Blow Out Preventer (BOP) is removed and Xmas tree installed, at which point the upper plug (11) is broken.
A process for suspending a subsea hydrocarbon well, wherein the process comprises:
Dependencies are inferred from the claim text.