Back to results
US 12,428,535 B2Granted
High throughput manufacture of polyurethane foam layers
AssigneeMölnlycke Health Care AB
InventorAntti Tapani Holopainen
Life of this patent
Estimating the term…
Abstract
Described is an at least partly continuous process for making polyurethane foam layers that are suitable for medical applications, in particular in wound dressings, at a high throughput rate. The described process includes a step of accelerated curing of the polyurethane foam performed at a stage of the overall curing process at which the risk of a run-away reaction is minimized.
Claims14
Process for making polyurethane foam layer, said process comprising at least the following steps:
- (i) at least one mixing step in which one or more polyurethane prepolymer(s) comprising an isocyanate-capped polyol or an isocyanate-capped polyurethane is/are mixed or brought in contact, with each other, and with water, in a mixing or contact zone, wherein said polyurethane prepolymer derive(s) from a reaction between a polyol, and a diisocyanate compound selected from the group consisting of hexamethylene diisocyanate (HDI), toluene diisocyanate (TDI), methylene diphenyl diisocyanate (MDI), and isophorone diisocyanate (IPDI), or any mixture thereof;
- (ii) at least one layer forming step in which the mixture from step (i) is applied onto a moving substrate to form a layer and to begin the curing process on the substrate;
- (iii) at least one transporting step during which the foam layer on the substrate from step (ii) is a least partly moved along a production line, during which step the polyurethane prepolymer or precursor thereof in the foam layer at least partly cures, and the thickness of the layer increases due to foaming;
- (iv) at least one step of accelerated curing, which occurs at a predetermined point in time after conclusion of step (ii) and, correspondingly, at a predetermined location along the production line, wherein curing is accelerated by subjecting the foam as moving on the substrate to radiation heating,
- wherein said “predetermined point” in time in step (iv) is reached 2 to 10 minutes after the beginning of step (iii), or
- wherein said “predetermined point” in time in step (iv) is reached once a given volume segment of the foam layer has reached a degree of curing of from 50% to 90%.
3 more elements
Dependencies are inferred from the claim text.