Back to results
US 12,225,668 B2Granted
Production data creation device and production data creation method
AssigneePanasonic Intellectual Property Management Co., Ltd.
InventorsEiji Shigaki, Taichi Shimizu, Takaaki Yokoi, Takuya Yamazaki
Life of this patent
Estimating the term…
Abstract
A production data creation device includes an input unit and a setting unit. The input unit receives an input of one application from among a plurality of applications displayed on a screen. The setting unit sets one or more operation parameters used by a component mounter to mount a component on a board, on the basis of the input application.
Claims18
A production data creation device comprising:
- an input interface configured to receive an input of one application from among a plurality of applications displayed on a screen;
- and
- a processor configured to:
- determine a priority weight between quality and productivity for the inputted application, and
- set one or more operation parameters including a recognition parameter for recognizing a shape of a component, the one or more operation parameters to be used by a component mounter to mount the component on a board, on the basis of the inputted application and the priority weight.
2 more elements
A production data creation method comprising:
- receiving an input of one application from among a plurality of applications displayed on a screen;
- determining, by a processor, a priority weight between quality and productivity for the inputted application;
- and
- setting, by the processor, one or more operation parameters including a recognition parameter for recognizing a shape of a component, the one or more operation parameters used by a component mounter to mount the component on a board, on the basis of the inputted application and the priority weight.
1 more element
A production data creation device comprising:
- an input interface configured to:
- receive an input of one application from among a plurality of applications displayed on a screen, and
- receive at least inputs of one or more input parameters based on quality and productivity;
- and
- a processor configured to:
- determine a priority weight between quality and productivity for the inputted application, and
- set one or more operation parameters including a recognition parameter for recognizing a shape of a component, the one or more operation parameters used by a component mounter to mount a component on a board, on the basis of the one or more inputted parameters that have been inputted and the priority weight.
4 more elements
A production data creation method comprising:
- receiving an input of one application from among a plurality of applications displayed on a screen;
- receiving at least inputs of one or more input parameters based on quality and productivity;
- determining a priority weight between quality and productivity for the inputted application;
- and
- setting one or more operation parameters including a recognition parameter for recognizing a shape of a component, the one or more operation parameters to be used by a component mounter to mount the component on a board, on the basis of the one or more input parameters that have been inputted and the priority weight.
2 more elements
Dependencies are inferred from the claim text.