Production schedule estimation method and system of semiconductor process
AssigneePowerchip Semiconductor Manufacturing Corporation
InventorsChih-Neng Liu, Chih-Chuen Huang, Chia-Jen Fu, Chih-Hsiang Chang
Life of this patent
Estimating the term…
Loading patent…
AssigneePowerchip Semiconductor Manufacturing Corporation
InventorsChih-Neng Liu, Chih-Chuen Huang, Chia-Jen Fu, Chih-Hsiang Chang
Estimating the term…
A production schedule estimation method and a production schedule estimation system are provided. The production schedule estimation method includes the following steps. Current-day work-in-process data, machine group cycle time data of a machine group, and productivity data of the machine group are obtained. The current-day work-in-process data, the cycle time data of the machine group, and the productivity data of the machine group are inputted into a prediction model. Current-day cycle time data and a current-day move volume for each of multiple stations in the machine group are calculated through the prediction model. And, current-day move data is calculated according to the current-day cycle time data and the current-day move volume for each of the multiple stations in the machine group.
A production schedule estimation method of a semiconductor process, comprising:
A production schedule estimation system of a semiconductor process, comprising:
Dependencies are inferred from the claim text.