Assembly and method for installing a pile into a seabed
AssigneeHeerema Marine Contractors Nederland B.V.
InventorGerardus Petrus Meskers
Life of this patent
Estimating the term…
Loading patent…
AssigneeHeerema Marine Contractors Nederland B.V.
InventorGerardus Petrus Meskers
Estimating the term…
The present invention relates to an assembly for installing a pile in a seabed, the assembly comprising a vessel comprising a positioning system for keeping the vessel at an installation location relative to the seabed, the positioning system having a positioning stiffness; a pile guiding system configured to guide the pile during installation thereof, the pile guiding system comprising a base provided on the vessel; a first guiding device connected to the base, the first guiding device being configured to accommodate the pile during installation thereof; a resilient member for providing a resilient connection between the vessel and the pile during installation thereof for allowing relative motions between the pile and the vessel, the resilient member having a connection stiffness, wherein the resilient member is configured and intended to keep a natural period of a pivoting movement of the pile about the seabed caused by waves during installation thereof longer than a dominant wave period of a wave spectrum at the installation location by providing the resilient connection with a low connection stiffness.
An assembly for installing a pile in a seabed, the assembly comprising:
A pile guiding system configured to be connected to a floating vessel, the pile guiding system being configured to hold a pile during pile installation, wherein the pile guiding system comprises:
A method for installing a pile with a vessel, the method comprising the steps:
Dependencies are inferred from the claim text.