Back to results
US 12,181,951 B2Granted
Forecasting failure of power supply in a data center
AssigneeAA Power Inc.
InventorQun Lu
Life of this patent
Estimating the term…
Abstract
An apparatus comprising a power supply, which has first and second components, and actuarial circuitry in communication with the power supply. The actuarial circuitry forecasts the power supply's life expectancy based on real-time measurements of operational parameters of said first and second components.
Claims13
An apparatus comprising:
- a power supply and actuarial circuitry in communication with said power supply, said power supply comprising first and second components, wherein said actuarial circuitry is configured to forecast life expectancy of said power supply based at least in part on real-time measurements of operational parameters of said first and second components, wherein said actuarial circuitry is configured to receive a capacitor data-stream and a fan data-stream from said power supply, wherein said first and second components of said power supply having an electrolytic capacitor and a fan, respectively, wherein said actuarial circuitry comprises a real-time fan-mortality forecasting circuit that receives a stochastic fan model and a real-time capacitor-mortality forecasting circuit that receives a stochastic capacitor model, wherein, based on outputs of said real-time fan-mortality forecasting circuit and said real-time capacitor-mortality forecasting circuit, said actuarial circuitry outputs a plurality of voltages selected from the group consisting of a first voltage and a second voltage, said plurality of voltages forming a pattern that is indicative of a power-supply life expectancy that serves as a basis for scheduling replacement of said power supply.
A method of scheduling replacement of a power supply that comprises an electrolytic capacitor and a fan, said method comprising:
- receiving a capacitor data-stream and a fan data-stream from said power supply;
- receiving a stochastic fan-model;
- receiving a stochastic capacitor-model;
- using said stochastic fan-model and said stochastic capacitor-model to output a plurality of voltages selected from the group consisting of a first voltage and a second voltage, said plurality of voltages forming a pattern that is indicative of a power-supply life expectancy that serves as a basis for scheduling replacement of said power supply;
- and, based on said plurality of voltages, scheduling said replacement of said power supply.
2 more elements
Dependencies are inferred from the claim text.