Control system and method for work machine
AssigneeKomatsu Ltd.
InventorYukihisa Takaoka
Life of this patent
Estimating the term…
Abstract
A work machine includes a work implement. A control system for the work machine includes a processor. The processor acquires actual topography data indicative of an actual topography of a work site. The processor acquires work data including a width of a work implement. The processor generates work path data based on the actual topography data and the work data. The work path data indicates positions of a plurality of work paths aligned in a lateral direction. The processer determines a work order of the plurality of work paths based on the work path data. The processer controls a work machine to perform work according to the work paths in the work order.
Claims10
A control system for a work machine including a work implement, the control system comprising:
- a processor configured to
- acquire actual topography data indicative of an actual topography of a work site,
- acquire work data including a width of the work implement, a slot width, and a wall width,
- generate work path data based on the actual topography data and the work data, the work path data indicating positions of a plurality of work paths aligned in a lateral direction, the plurality of work paths including at least three slots and at least two digging walls positioned between adjacent pairs of the at least three slots, each of the at least three slots having a width equal to the slot width and each of the at least two digging walls having a width equal to the wall width, the work path data including type data indicating a type of work performed by the work machine and the type data including digging of the slots and digging of the digging wall,
- acquire area data indicative of a work area including the plurality of work paths, and
- determine a work order of the plurality of work paths based on the type data of the work path data so that work on the digging wall is performed after work on the at least three slots in the work area, and
- control the work machine to perform work according to the work paths in the work order,
- wherein
- the at least three slots include a first slot positioned at one end of the work area and a farthest slot positioned at another end of the work area, the one end of the work area being spaced from the other end of the work area along the lateral direction,
- the at least two digging walls include a first digging wall that is closest to the first slot and a farthest digging wall that is closest to the farthest slot along the lateral direction, and
- the processor is further configured to determine the work order of the plurality of work paths such that
- the at least three slots are worked in order from the first slot to the farthest slot, and
- after the work on the at least three slots is completed, the at least two digging walls are worked in order from the farthest digging wall to the first digging wall such that the work on the at least two digging walls is conducted in the opposite order with respect to the lateral direction as the work on the at least three slots.
A method executed by a processor in order to control a work machine including a work implement, the method comprising:
- acquiring actual topography data indicative of an actual topography of a work site;
- acquiring work data including a width of the work implement, a slot width, and a wall width;
- generating work path data based on the actual topography data and the work data, the work path data indicating positions of a plurality of work paths aligned in a lateral direction, the plurality of work paths including at least three slots and at least two digging walls positioned between adjacent pairs of the at least three slots, each of the at least three slots having a width equal to the slot width and each of the at least two digging walls having a width equal to the wall width, the work path data including type data indicating a type of work performed by the work machine and the type data including digging of the slots and digging of the digging wall;
- acquiring area data indicative of a work area including the plurality of work paths;
- determining a work order of the plurality of work paths based on the type data of the work path data so that work on the digging wall is performed after work on the plurality of at least three slots in the work area;
- and
- controlling the work machine to perform work according to the work paths in the work order
- wherein,
- the at least three slots include a first slot positioned at one end of the work area and a farthest slot positioned at another end of the work area, the one end of the work area being spaced from the other end of the work area along the lateral direction,
- the at least two digging walls include a first digging wall that is closest to the first slot and a farthest digging wall that is closest to the farthest slot along the lateral direction,
- the work order of the plurality of work paths is determined such that
- the at least three slots are worked in order from the first slot to the farthest slot, and
- after the work on the at least three slots is completed, the at least two digging walls are worked in order from the farthest digging wall to the first digging wall such that the work on the at least two digging walls is conducted in the opposite order with respect to the lateral direction as the work on the at least three slots.