Optimization of expensive cost functions subject to complex multidimensional constraints
AssigneeBWXT Advanced Technologies LLC
InventorRoss Evan Pivovar
Life of this patent
Estimating the term…
Loading patent…
AssigneeBWXT Advanced Technologies LLC
InventorRoss Evan Pivovar
Estimating the term…
A method is used to design nuclear reactors using design variables and metric variables. A user specifies ranges for the design variables and target values for the metric variables. A set of design parameter samples are selected. For each sample, the method runs three processes, which compute metric variables to thermal-hydraulics, neutronics, and stress. The method applies a cost function to each sample to compute an aggregate residual of the metric variables compared to the target values. The method trains a machine learning model using the samples and the computed aggregate residuals. The method shrinks the range for each design variable according to correlation between the respective design variable and estimated residuals using the machine learning model. These steps are repeated until a sample having a smallest residual is unchanged for multiple iterations. The method then uses the final machine learning model to assess relative importance of each design variable.
A method of designing nuclear reactors, which is performed in a system including one or more processors and a non-transitory memory coupled to the one or more processors and storing software instructions executed by the one or more processors, the method comprising:
A computing system, comprising:
A method of optimizing design constraints for manufacturing, which is performed in a system including one or more processors and a non-transitory memory coupled to the one or more processors and storing software instructions executed by the one or more processors, the method comprising:
A computing system, comprising: