Determining oil and water production rates in multiple production zones from a single production well
AssigneeSaudi Arabian Oil Company
InventorsHsieh Chen, Martin E. Poitzsch, Hooisweng Ow, Ivan Cetkovic
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsHsieh Chen, Martin E. Poitzsch, Hooisweng Ow, Ivan Cetkovic
Estimating the term…
A wellbore that supplies production fluid from a first production zone and a second production zone is produced. Production fluids from the first and second production zone are comingled within a same production tubular. A first tracer is pulsed into the first production zone. A second tracer is pulsed into the second production zone. The first tracer and the second tracer are barcoded such that the first tracer and the second tracer can be differentiated from one another. A first tracer decay is measured at a topside facility. A second tracer decay is measured at the topside facility. A water cut of the first production zone and the second production zone is determined based upon the first tracer decay and the second tracer decay.
A method comprising:
A system comprising:
A method comprising:
Dependencies are inferred from the claim text.