Scheduling solution configuration method and apparatus, computer readable storage medium thereof, and computer device
AssigneeGuizhou Baishancloud Technology Co., Ltd.
InventorsLijia Fu, Hui Miao
Life of this patent
Estimating the term…
Abstract
A scheduling scheme configuration method includes performing state verification on a plurality of operation dimensions involved in generating a scheduling scheme, and, in response to one or more of the operation dimensions being abnormal, removing the one or more abnormal operation dimensions to generate a new scheduling scheme.
Claims17
A method for configuring a scheduling scheme of access resources, comprising:
- performing state verification on a plurality of operation dimensions involved in generating a scheduling scheme, including:
- verifying a timeliness of basic data of each of the operation dimensions, and determining, in response to the timeliness of the basic data of one of the operation dimensions exceeding a corresponding failure threshold, the one of the operation dimensions to be abnormal;
- and
- verifying whether an output scheduling scheme from each of the operation dimensions after operation is abnormal, including, for each of the operation dimensions:
- comparing the output scheduling scheme of the operation dimension with an input scheduling scheme of the operation dimension;
- and
- in response to a change of the output scheduling scheme relative to the input scheduling scheme exceeding an abnormality threshold, determining that the operation dimension is abnormal;
- and
- in response to one or more of the operation dimensions being abnormal, removing one or more abnormal operation dimensions to generate a new scheduling scheme:
- wherein the basic data involved in each of the operation dimensions is derived from an operation and maintenance configuration, a database of a monitoring system, a big data platform, a configuration management system, or a big data system.
An apparatus for configuring a scheduling scheme of access resources, comprising:
- a memory storing a computer program;
- and
- a processor configured to execute the computer program to:
- perform state verification on a plurality of operation dimensions involved in generating a scheduling scheme, including:
- verifying a timeliness of basic data of each of the operation dimensions, and determining, in response to the timeliness of the basic data of one of the operation dimension exceeding a corresponding failure threshold, one of the operation dimension to be abnormal;
- and
- verifying whether an output scheduling scheme from each of the operation dimensions is abnormal by:
- comparing the output scheduling scheme of the operation dimension with an input scheduling scheme of the operation dimension;
- and
- in response to a change of the output scheduling scheme relative to the input scheduling scheme exceeding an abnormality threshold, determining that the operation dimension is abnormal;
- and
- in response to one or more of the operation dimensions being abnormal, remove one or more abnormal operation dimensions to generate a new scheduling scheme:
- wherein the basic data involved in each of the operation dimensions is derived from an operation and maintenance configuration, a database of a monitoring system, a big data platform, a configuration management system, or a big data system.
A non-transitory computer readable storage medium storing computer programs for configuring a scheduling scheme of access resources, the computer programs, when executed by a processor, cause the processor to:
- perform state verification on a plurality of operation dimensions involved in generating a scheduling scheme, including:
- verifying a timeliness of basic data of each of the operation dimensions, and determining, in response to the timeliness of the basic data of one of the operation dimension exceeding a corresponding failure threshold, the one of the operation dimension to be abnormal;
- and
- verifying whether an output scheduling scheme from each of the operation dimensions after operation is abnormal, including, for each of the operation dimensions:
- comparing the output scheduling scheme of the operation dimension with an input scheduling scheme of the operation dimension;
- and
- in response to a change of the output scheduling scheme relative to the input scheduling scheme exceeding an abnormality threshold, determining that the operation dimension is abnormal;
- and
- in response to one or more of the operation dimensions being abnormal, remove one or more abnormal operation dimensions to generate a new scheduling scheme;
- wherein the basic data involved in each of the operation dimensions is derived from an operation and maintenance configuration, a database of a monitoring system, a big data platform, a configuration management system, or a big data system.
Dependencies are inferred from the claim text.