Method of delivering frac fluid and additives
AssigneeTetra Technologies, Inc.
InventorsEnrico J. Termine, Robert I. Richie
Life of this patent
Estimating the term…
Loading patent…
AssigneeTetra Technologies, Inc.
InventorsEnrico J. Termine, Robert I. Richie
Estimating the term…
A method for the controlled delivery of a fracturing fluid to a well bore comprises formulating an aqueous base fluid such that it meets or exhibits desired physical and chemical characteristics for an optimal fracturing fluid. The formulation of the aqueous base fluid max involve commingling one or more sources of waste water with a source of fresh water followed by controlled injection of one or more additives. This process is substantially completed prior to delivering the aqueous base fluid to the well site. This allows the delivery of an optimal volume of the aqueous base fluid with homogeneously blended additives to the well bore.
A method for controlled delivery of a fracturing fluid to a well bore comprising:
A method for controlled delivery of a fracturing fluid to a well bore comprising:
Dependencies are inferred from the claim text.