Back to results
US 11,306,563 B2Granted
Drilling rig communication systems, devices, and methods
AssigneeNabors Drilling Technologies USA, Inc.
InventorsSri Valleru, Eric D. Sawyer, Divye Kumar
Life of this patent
Estimating the term…
Abstract
Systems, devices, and methods for carrying out communications on a drilling rig are presented. A drilling collaboration platform may be used to schedule tasks on the drilling rig and communicate with third parties. The drilling collaboration platform may be configured to generate vendor lists, send notifications and alerts to third parties, generate forms required for completing tasks, and gather data from the drilling rig.
Claims8
A method of communicating for a drilling operation, comprising:
- receiving, with a controller in communication with a drilling rig, user input of drilling operation tasks to be executed on the drilling rig;
- wherein a first task must be completed before a second task is started;
- generating, with the controller, a drilling rig schedule to execute the tasks;
- communicating, with the controller, a Request For Quote (RFQ) for a first task of the tasks to a plurality of third parties;
- receiving, with the controller, responses to the RFQ from the plurality of third parties;
- wherein the responses comprise data relating to the plurality of third parties;
- selecting, with the controller, and based on the responses to the RFQ, a first third party to execute the first task;
- notifying, with the controller, the first third party that the first third party has been selected to execute the first task;
- generating, with the controller, a field ticket based on the first task for the first third party;
- wherein the field ticket includes data received in a response to the RFQ from the first third party;
- executing, with the drilling rig, at least a portion of the first task for the third party;
- wherein the drilling rig comprises a drive system and a drawworks;
- measuring, with one or more sensors operably associated with the drilling rig, one or more drilling parameters during the execution of the first task;
- receiving, with the controller, the one or more drilling parameters measured by the one or more sensors during the execution of the first task;
- determining, based on the received one or more drilling parameters, that there is a potential problem with the first task;
- modifying, with the controller, the drilling rig schedule to delay the second task until the potential problem with the first task is resolved;
- sending, with the controller, an alert regarding the delay to the second task to a second third party that is associated with the second task;
- generating, with the controller, a task report of the executed first task based on the received one or more drilling parameters;
- and
- storing, in a database, communications sent to and from the plurality of third parties;
- wherein the communications are correlated in the database by each third party in the plurality of third parties.
18 more elements
Dependencies are inferred from the claim text.