Flexible work breakdown structure
AssigneeProcore Technologies, Inc.
InventorsConnor McCormick, Adam Wells, Magnus Palm, Mike Le, James Solum, Danielle Sandoval, Brian Field
Life of this patent
Estimating the term…
Loading patent…
AssigneeProcore Technologies, Inc.
InventorsConnor McCormick, Adam Wells, Magnus Palm, Mike Le, James Solum, Danielle Sandoval, Brian Field
Estimating the term…
Disclosed herein is an improved software application that enables users to create and manage a customized WBS that can be applied to a specific project. For instance, in one aspect, the disclosed process may involve three primary phases: (1) a first phase that involves defining an organization-level WBS comprising a first set of customized, multi-dimensional WBS codes that serve as a starting point for the WBS codes to use for projects being handled by the organization, (2) a second phase that involves defining a project-level WBS comprising a second set of customized, multi-dimensional WBS codes to use for a particular project being handled by the organization, and (3) a third phase that involves using the defined project-level WBS to manage certain aspects of the particular project, such as budgeting for the particular project.
A computing system comprising:
A method performed by a computing system, the method comprising:
A non-transitory computer-readable medium, wherein the non-transitory computer-readable medium is provisioned with program instructions that are executable by at least one processor to cause a computing system to:
Dependencies are inferred from the claim text.