Power meter with movable terminal blocks
AssigneeHoneywell International Inc.
InventorThomas Staub
Life of this patent
Estimating the term…
Abstract
A power meter includes a power meter housing and a terminal block that is movable relative to the power meter housing between a first orientation where two or more terminals of the terminal block face a first direction, and a second orientation where the two or more terminals of the terminal block face a second direction. A controller is operatively coupled to the two or more terminals of the terminal block in the first orientation and in the second orientation and is configured to determine a number of power monitor parameters for one or more phases of power that is delivered to a load based at least in part on signals at the two or more terminals of the terminal block.
Claims20
A power meter for monitoring one or more phases of power that is delivered to a load, comprising:
- a power meter housing;
- a terminal block movable relative to the power meter housing into two different orientations including a first orientation where two or more terminals of the terminal block face a first direction, and a second orientation where the two or more terminals of the terminal block face a second direction that is opposite the first direction, wherein the two or more terminals of the terminal block are exposed to outside of the power meter housing in both the first orientation and the second orientation;
- and
- a controller operatively coupled to the two or more terminals of the terminal block in the first orientation and in the second orientation, the controller configured to determine a number of power monitor parameters for one or more phases of power that is delivered to a load based at least in part on signals at the two or more terminals of the terminal block.
A power meter, comprising:
- a power meter housing;
- a first terminal block removably securable relative to the power meter housing in two different orientations including a first orientation where two or more terminals of the first terminal block face a first direction, and a second orientation where the two or more terminals of the first terminal block face a second direction, wherein the two or more terminals of the first terminal block are exposed to outside of the power meter housing in both the first orientation and the second orientation;
- a second terminal block removably securable relative to the power meter housing in two different orientations including a first orientation where two or more terminals of the second terminal block face the first direction, and a second orientation where the two or more terminals of the second terminal block face the second direction, wherein the two or more terminals of the second terminal block are exposed to outside of the power meter housing in both the first orientation and the second orientation;
- a controller operatively coupled to the two or more terminals of the first terminal block in the first orientation and in the second orientation, and operatively coupled to the two or more terminals of the second terminal block in the first orientation and in the second orientation, the controller configured to determine a number of power monitor parameters for one or more phases of power that is delivered to a load based at least in part on signals at the two or more terminals of the first terminal block and at the two or more terminals of the second terminal block;
- two or more electrical contacts extending into the first terminal block such that wires secured within the first terminal block are electrically coupled to the two or more electrical contacts that extend into the first terminal block;
- and
- two or more electrical contacts extending into the second terminal block such that wires secured within the second terminal block are electrically coupled to the two or more electrical contacts that extend into the second terminal block.
A method of installing a power meter that includes a power meter housing and a terminal block that is movable relative to the power meter housing, the method comprising:
- determining whether the power meter is to be installed in a manner that enables wiring access to a front side of the power meter or in a manner that enables wiring access to a back side of the power meter;
- when the power meter is to be installed in a manner that enables wiring access to the front side of the power meter, attaching the terminal block to the power meter housing such that the terminal block faces forward;
- and
- when the power meter is to be installed in a manner that enables wiring access to the back of the power meter, attaching the terminal block to the power meter housing such that the terminal block faces backward.
Dependencies are inferred from the claim text.