System and method of layering material
AssigneeCaterpillar Inc.
InventorMo Wei
Life of this patent
Estimating the term…
Abstract
A system for moving material from a first work area to a second work includes a material moving machine, a machine position sensor and a controller system. The controller system performs first material moving operations including determining a premature termination of a material stacking operation. The controller system performs additional material moving operations including instructing a material moving machine in response to the premature termination of a material stacking operation.
Claims20
A computer-implemented method of responding to a premature direction reversal of a material moving machine, the computer-implemented method comprising:
- monitoring, by a control system, a location of the material moving machine while the material moving machine is moving a material to form a fill layer of the material within a fill layer zone;
- calculating a target reverse point indicative of a target material pile location as adjacent to a location of a previously placed material pile within the fill layer zone using a previous reverse point of the material moving machine for the previously placed material pile within the fill layer zone and a size of an average material pile;
- determining, by the control system, a premature direction reversal of the material moving machine at a premature direction reversal location based at least partially on a deviation distance between the location of the material moving machine and the target material pile location, wherein the premature direction reversal is indicative of leaving a pile of material as an improperly placed material pile;
- identifying a position of the improperly placed material pile based on the premature direction reversal location;
- storing, by the control system, the position of the improperly placed material pile;
- controlling, by the control system, the material moving machine to align the material moving machine with the improperly placed material pile;
- and
- controlling, by the control system, the material moving machine to re-engage and move, using an implement of the material moving machine, the improperly placed material pile to the target material pile location within the fill layer zone.
A control system for responding to an incomplete material pile during a material layering operation by a material moving machine, the control system comprising:
- a memory configured to retrievably store one or more algorithms;
- and
- a controller in communication with the memory, the controller, based on the one or more algorithms, configured to:
- calculate a target reverse point indicative of a target material pile location as adjacent to a location of a previously placed material pile within a fill layer zone using a previous reverse point of the material moving machine for the previously placed material pile within the fill layer zone and a size of an average material pile, the material moving machine moving material to form a fill layer within the fill layer zone;
- identify a premature direction reversal of the material moving machine at a premature direction reversal location leaving a pile of the material as the incomplete material pile, the premature direction reversal identified based at least partially on a material moving machine position and the target material pile location;
- instruct the material moving machine to align with the premature direction reversal location, and
- instruct the material moving machine to engage an implement to restart a material movement procedure at the premature direction reversal location to move material of the incomplete material pile to the target material pile location within the fill layer zone.
An autonomous method of mining using a dozer comprising a drive mechanism to move the dozer in forward and reverse directions, an adjustable blade for pushing material when the dozer moves in the forward direction, and a location position sensor to determine a position of the dozer, the method comprising:
- monitoring the location of the dozer while the dozer is moving material using the adjustable blade to form a fill layer within a fill layer zone;
- calculating a target reverse point for the dozer using a previous reverse point of the dozer for a previously placed material pile within the fill layer zone and a size of an average material pile;
- calculating a target material pile location zone that includes the target reverse point within the fill layer zone for the dozer to push the material, the target material pile location zone adjacent a location of the previously placed material pile within the fill layer zone and the target material pile location zone including a beginning location and farthest location with respect to the target reverse point for the dozer;
- providing instructions to the drive mechanism and the adjustable blade of the dozer to move the dozer toward the target material pile location zone while pushing the material;
- comparing the location of the dozer to the target material pile location zone;
- storing the location of the dozer when it reverses direction from the forward direction to the reverse direction when the dozer reverses direction before the dozer entered the target material pile location zone while pushing the material, thereby forming an improperly placed material pile;
- and
- providing instructions to the drive mechanism and the adjustable blade of the dozer to move the dozer to the improperly placed material pile and adjust the blade to push the improperly placed material pile into the target material pile location zone within the fill layer zone.
Dependencies are inferred from the claim text.