Managing corrosion and scale buildup in a wellbore
AssigneeSaudi Arabian Oil Company
InventorsAnuj Gupta, Sunder Ramachandran, Sebastian Csutak
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsAnuj Gupta, Sunder Ramachandran, Sebastian Csutak
Estimating the term…
A method of determining a risk of corrosion and scale formation of tubing in a wellbore includes receiving, from a plurality of first sensors positioned at a downhole location of a wellbore, first production stream information and receiving, from a plurality of second sensors positioned at an uphole location, second production stream information. The method also includes performing a material balance to determine a first value representing a difference between a first production steam flow rate at the downhole location and a second production stream flow rate at the uphole location. The method also includes determining a second value representing a critical metal ion concentration of the production stream and, based on a result of comparing the first value with a threshold and based on the second value, determining a third value representing a risk of corrosion and scale formation at the tubing disposed within the wellbore.
A method comprising:
A system comprising:
A system comprising:
Dependencies are inferred from the claim text.