Back to results
US 11,078,020 B2Granted
System and method for ripening produce
AssigneeWalmart Apollo, LLC
InventorJoshua T. Bohling
Life of this patent
Estimating the term…
Abstract
A ripening schedule for produce is created and the ripening schedule when implemented at a ripening chamber is effective to control the environmental conditions and the time spent in the ripening chamber by the produce in order to conform ripening conditions of the produce to the target shipping date. The ripening schedule is applied to control ripening conditions in the ripening chamber.
Claims18
A system that is configured to adjust ripening conditions for produce, the system comprising:
- a first shipment vehicle that is configured to transport produce;
- a second shipment vehicle that is configured to transport the produce;
- a first ripening chamber, the first ripening chamber including at least one first mechanical element that controls environmental conditions within the first ripening chamber, wherein the at least one first mechanical element is one or more of:
- a gas control valve, a heating element, a cooling element, or a fan;
- a second ripening chamber, the second ripening chamber including at least one second mechanical element that controls environmental conditions within the second ripening chamber, wherein the at least one second mechanical element is one or more of:
- a gas control valve, a heating element, a cooling element, or a fan;
- a first sensor that is deployed on the first shipment vehicle, the first shipment vehicle moving the produce from the production area, the first sensor obtaining first information associated with shipment conditions of the produce;
- a second sensor that is deployed at a distribution center or warehouse, the produce being delivered to the distribution center or warehouse via the first shipment vehicle, the second sensor configured to determine second information concerning the condition and grade of the produce;
- an electronic user device that is configured to receive from a user a target shipping date to ship the produce to a retail store or customer from the distribution center or warehouse;
- an electronic communication network coupled to the first sensor, the second sensor, and the electronic user device;
- a database at a central processing center that is configured to store the first information, the second information, and the target shipping date;
- a control circuit at the central processing center and coupled to the network and the database, the control circuit configured to:
- obtain the first information, second information, and target shipping date from the database and
- create a first ripening schedule, the first ripening schedule when implemented at the first ripening chamber being effective to control the environmental conditions and the time spent in the first ripening chamber by the produce in order to conform ripening conditions of the produce to the target shipping date;
- apply the first ripening schedule to control ripening conditions in the first ripening chamber, wherein the first ripening schedule is applied via first electronic instructions to the at least one first mechanical element of the first ripening chamber and the first electronic instructions are effective to control the physical operation of the at least one first mechanical element of the first ripening chamber;
- wherein third information concerning conditions of the produce in the first ripening chamber is obtained and wherein the control circuit is configured to adjust the first ripening schedule according to the third information;
- wherein the control circuit utilizes the third information to adjust a second ripening schedule of the second ripening chamber, wherein the adjusted second ripening schedule is applied via second electronic instructions to the at least one second mechanical element of the second ripening chamber and the second electronic instructions are effective to control the physical operation of the at least one second mechanical element of the second ripening chamber;
- wherein the produce is shipped on the second shipment vehicle according to the target shipping date.
15 more elements
A method for adjusting ripening conditions for produce, the method comprising:
- providing a first shipment vehicle that is configured to transport produce;
- providing a second shipment vehicle that is configured to transport the produce;
- providing a first ripening chamber, the first ripening chamber including at least one first mechanical element that controls environmental conditions within the first ripening chamber, wherein the at least one first mechanical element is one or more of:
- a gas control valve, a heating element, a cooling element, or a fan;
- providing a second ripening chamber, the second ripening chamber including at least one second mechanical element that controls environmental conditions within the second ripening chamber, wherein the at least one second mechanical element is one or more of:
- a gas control valve, a heating element, a cooling element, or a fan;
- at a first sensor that is deployed on the first shipment vehicle, obtaining first information associated with shipment conditions of the produce, the first shipment vehicle moving the produce from the production area;
- at a second sensor that is deployed at a distribution center or warehouse, determining second information concerning the condition and grade of the produce, the produce being delivered to the distribution center or warehouse via the first shipment vehicle;
- receiving from a user at an electronic user device a target shipping date to ship the produce to a retail store or customer from the distribution center or warehouse;
- storing at a database at a central processing center the first information, the second information, and the target shipping date;
- at a control circuit at the central processing center, obtaining the first information, the second information, and the target shipping date from the database and creating a first ripening schedule, the first ripening schedule when implemented at the first ripening chamber being effective to control the environmental conditions and the time spent in the first ripening chamber by the produce in order to conform ripening conditions of the produce to the target shipping date, and applying the first ripening schedule to control ripening conditions in the first ripening chamber, wherein the first ripening schedule is applied via first electronic instructions to the at least one first mechanical element of the first ripening chamber and the first electronic instructions are effective to control the physical operation of the at least one first mechanical element of the first ripening chamber;
- wherein third information concerning conditions of the produce in the first ripening chamber is obtained and wherein the control circuit dynamically and in real-time adjusts the first ripening schedule according to the third information;
- wherein the control circuit utilizes the third information to adjust a second ripening schedule of the second ripening chamber, wherein the adjusted second ripening schedule is applied via second electronic instructions to the at least one second mechanical element of the second ripening chamber and the second electronic instructions are effective to control the physical operation of the at least one second mechanical element of the second ripening chamber;
- wherein the produce is shipped on the second shipment vehicle according to the target shipping date.
11 more elements
Dependencies are inferred from the claim text.