Reducing erosional peak velocity of fluid flow through sand screens
AssigneeExxonMobil Upstream Research Company
InventorsFederico G. Gallo, Jason Y. Wang, Christian S. Mayer
Life of this patent
Estimating the term…
Loading patent…
AssigneeExxonMobil Upstream Research Company
InventorsFederico G. Gallo, Jason Y. Wang, Christian S. Mayer
Estimating the term…
A method of reducing erosional peak velocity includes arranging a sand control screen assembly in an open hole section of a wellbore, the sand control screen assembly including a base pipe defining a plurality of flow ports, a sand screen arranged about the base pipe, and a wellbore isolation device deployed within an annulus defined between the sand control screen assembly and an inner wall of the wellbore. A fluid from a surrounding subterranean formation is circulated within the annulus, and the fluid within the annulus is diverted through the sand screen and into the base pipe upon approaching the wellbore isolation device. A peak velocity of the fluid flowing through the sand screen is reduced with a peak flux reducing assembly arranged axially adjacent the wellbore isolation device.
A method of reducing erosional peak velocity, comprising:
A sand control screen assembly deployable within an open hole section of a wellbore, comprising:
A sand control screen assembly deployable within an open hole section of a wellbore, comprising:
Dependencies are inferred from the claim text.