Back to results
US 10,956,848 B1Granted
Business process management information display
AssigneeWells Fargo Bank, N.A.
InventorsTimothy Gerard Hanson, Jr., Joseph Daniel Rodgers
Life of this patent
Estimating the term…
Abstract
A Business Process Management (BPM) information display system and method includes identifying a BPM asset that has been modified, comparing the modified BPM asset to a second version of the BPM asset, and identifying an activity within the modified BPM asset that has been modified. A user interface is generated by a computing system in which the modified BPM asset and the second version of the BPM asset are displayed, including highlighting the modified activity on the user interface.
Claims11
An information display system, comprising:
- a computing system including a processor programmed to:
- access a database storing a plurality of business process management (BPM) assets, with each of the BPM assets defining a process by which a business performs a particular task, the particular task including managing a mortgage loan application process;
- identify a BPM asset, in the database, that has been modified, the BPM asset being a file defining a diagram associated with the mortgage loan application process, with a plurality of activities being depicted on the diagram;
- compare the modified BPM asset to a second version of the BPM asset;
- based on the comparison, identify an activity within the modified BPM asset that has been modified;
- concurrently display the modified BPM asset on a first portion of a user interface and the second version of the BPM asset on a second portion of the user interface;
- highlight, with a first visual indicia, the modified activity on the first portion of the user interface;
- concurrently highlight, with a second visual indicia, the modified activity on the second portion of the user interface;
- and
- upon receiving selection of a step option on the user interface:
- determine whether the modified activity has been modified multiple times between the modified BPM asset and the second version of the BPM asset;
- and
- display each of a plurality of modifications associated with the modified activity in a sequential order.
10 more elements
Dependencies are inferred from the claim text.