Transformer test device and method for testing a transformer
AssigneeOmicron Electronics GmbH
InventorsReinhard Kaufmann, Boris Unterer, Markus Pütter
Life of this patent
Estimating the term…
Abstract
A transformer test device (10) for testing a transformer (40) has connections (12) for releasably connecting the transformer test device (10) to the transformer (40). The transformer test device (10) has a source (13) for generating a test signal for testing the transformer (40). The transformer test device (10) has a controllable switching means (15) which is connected to the connections (12) during a transformer test for the purpose of short-circuiting at least one winding (42) of the transformer (40).
Claims7
A transformer test device for testing a transformer, comprising:
- connections for releasably connecting the transformer test device to the transformer,
- a source for generating a test signal for testing the transformer, and
- a controllable switching device which is connected to the connections during a transformer test for the purpose of short-circuiting at least one winding of the transformer;
- a control device which is connected to the controllable switching device and is configured to automatically actuate the controllable switching device in accordance with a time schedule which depends on a selected test procedure;
- a measurement device for recording a test response of the transformer in reaction to the test signal, the measurement device connected to the at least one winding by connecting lines;
- and
- an evaluation device connected to the measurement device and is configured for evaluating the recorded test response,
- wherein the control device is further configured to run a transformer test that comprises a first portion of a time period of the transformer test, in which the controllable switching device is actuated such that the at least one winding of the transformer is not short-circuited for determining a first characteristic variable of the transformer, and a second portion of the time period of the transformer test, in which the controllable switching device is actuated such that the at least one winding of the transformer is short-circuited for determining a second characteristic variable of the transformer,
- wherein the measurement device is configured to perform a first measurement during the first portion of the time period, when the controllable switching device is activated such that the at least one winding of the transformer is not short-circuited, to determine the first characteristic variable of the transformer and to perform a second measurement during the second portion of the time period, when the controllable switching device is activated such that the at least one winding of the transformer is short-circuited, to determine the second characteristic variable of the transformer, and
- wherein the first measurement and second measurement are selected from a group including a transformation measurement, a short-circuit impedance measurement, a winding resistance measurement, a stray impedance measurement, and a dynamic resistance measurement, and the first measurement and second measurement are used by the evaluation device to determine operational reliability of the transformer by detecting faults on account of a resistance of the connecting lines based on the first characteristic variable of the transformer and the second characteristic variable of the transformer.
A method for testing a transformer comprising a transformer test device which has connections for releasably connecting the transformer test device to the transformer, wherein the method comprises:
- generating a test signal for testing the transformer;
- configuring a controllable switching device which is connected to the connections during a transformer test for the purpose of short-circuiting at least one winding of the transformer;
- configuring a control device which is connected to the controllable switching device and is designed in order to automatically actuate the controllable switching device in accordance with a time schedule which depends on a selected test procedure;
- recording, by a measurement device, a test response of the transformer in reaction to the test signal, the measurement device connected to the at least one winding by connecting lines;
- evaluating, by an evaluation device, the recorded test response;
- determining a first characteristic variable of the transformer during a first portion of a time period of the transformer test in which the controllable switching device is actuated such that the at least one winding of the transformer is not short-circuited for determining the first characteristic variable of the transformer;
- and
- determining a second characteristic variable of the transformer during a second portion of the time period of the transformer test in which the controllable switching device is actuated such that the at least one winding of the transformer is short-circuited for determining the second characteristic variable of the transformer,
- wherein the measurement device is configured to perform a first measurement during the first portion of the time period, when the controllable switching device is activated such that the at least one winding of the transformer is not short-circuited, to determine the first characteristic variable of the transformer and to perform a second measurement during the second portion of the time period, when the controllable switching device is activated such that the at least one winding of the transformer is short-circuited, to determine the second characteristic variable of the transformer, and
- wherein the first measurement and second measurement are selected from a group including a transformation measurement, a short-circuit impedance measurement, a winding resistance measurement, a stray impedance measurement, and a dynamic resistance measurement, and the first measurement and second measurement are used by the evaluation device to determine operational reliability of the transformer by detecting faults on account of a resistance of the connecting lines based on the first characteristic variable of the transformer and the second characteristic variable of the transformer.
Dependencies are inferred from the claim text.