Wind turbine control method and system
AssigneeMhi Vestas Offshore A/S
InventorsTue Hald, Alex Pericleous, Henrik Bæk Jørgensen
Life of this patent
Estimating the term…
Loading patent…
AssigneeMhi Vestas Offshore A/S
InventorsTue Hald, Alex Pericleous, Henrik Bæk Jørgensen
Estimating the term…
A method for controlling a wind power plant including a plurality of wind turbines that provide output power through a transmission line arrangement, wherein each wind turbine in the wind power plant has a nominal power limit setting. The method comprises determining spare capacity on the transmission line arrangement; and configuring one or more of the wind turbines in dependence on the determined spare capacity, such that said wind turbines are operable to exceed their respective nominal power limit setting in order to exploit the spare capacity on the transmission line arrangement. Aspects of the invention also relate to a power plant controller configured to implement the method.
A method of controlling a wind power plant including a plurality of wind turbines that provide an output power through a transmission line arrangement, wherein each wind turbine in the wind power plant has a nominal power limit setting, wherein the method comprises:
A power plant controller comprising at least a processor, a memory module, and an input/output system, and wherein the memory module includes a set of program code instructions which when executed by the processor, implements an operation of controlling a wind power plant including a plurality of wind turbines that provide an output power through a transmission line arrangement, wherein each wind turbine in the wind power plant has a nominal power limit setting, the operation comprising:
A computer program product stored on a machine readable medium, the computer program product comprising program code instructions for implementing an operation of controlling a wind power plant including a plurality of wind turbines that provide an output power through a transmission line arrangement, wherein each wind turbine in the wind power plant has a nominal power limit setting, the operation comprising:
Dependencies are inferred from the claim text.