Back to results
US 10,846,651 B2Granted
Analysis and correction of supply chain design through machine learning
AssigneeKinaxis Inc.
InventorsPhillip Williams, Marcio Oliveira Almeida, Zhen Lin, Behrouz Haji Soleimani, Seyednaser Nourashrafeddin, Chantal Bisson-Krol
Life of this patent
Estimating the term…
Abstract
A dynamic supply chain planning system for analysis of historical lead time data that uses machine learning algorithms to forecast future lead times based on historical lead time data, weather data and financial data related to locations and dates within the supply chain.
Claims17
A dynamic supply chain planning system comprising:
- a database comprising historical lead time data related to a supply chain, weather data and economic indicators data;
- a machine learning server in communication with the database, the machine learning server comprising a machine learning service and a data preparation module;
- an analytics module in communication with the database;
- and
- a user interface in communication with the analytics module;
- wherein:
- the data preparation module is in communication with the database to obtain the historical lead time data, the weather data and the economic indicators data;
- the data preparation module processes:
- the historical lead time data into a processed historical lead time dataset;
- the weather data into a processed weather dataset;
- and the economic indicators data into a processed economic indicators dataset, to provide a processed dataset for use by the machine learning service;
- the machine learning service comprises a forecasting module configured to forecast future lead times of the supply chain based on the processed dataset;
- and
- the machine learning server uploads the future lead times to the database;
- and wherein:
- the analytics module is configured to:
- receive from a user via the user interface, tolerance criteria for separation of the historical lead time data into a plurality of tolerance zones based on median absolute differences between actual lead time data and historical planned lead time data;
- and
- separate the historical lead time data into the plurality of tolerance zones;
- and
- wherein in relation to the forecasting module, the analytics module is configured to:
- obtain future lead times forecast by the forecasting module from the database;
- replace future planned lead times by the future lead times forecast by the forecasting module in accordance with an action criterion defined by the user for each tolerance zone.
20 more elements
A dynamic supply chain planning system comprising:
- a processor operable to execute instructions stored in a memory;
- and
- the memory includes specific instructions for forecasting future lead times of a supply chain based on:
- historical lead time data of the supply chain;
- weather data;
- and economic indicators data;
- wherein execution of the specific instructions causes the processor to:
- receive the historical lead time data, the weather data and the economic indicators data from one or more databases;
- process the historical lead time data by removing outlier data;
- extract a plurality of source locations, destination locations and shipment dates from the historical lead time data;
- extract a subset of weather data from the weather data based on the source locations, the destination locations and the shipment dates;
- extract a subset of economic indicators data from the economic indicators data based on the source locations, the destination locations and the shipment dates;
- prepare a processed dataset based on the processed historical lead time data, the subset of weather data and the subset of economic indicators data;
- the data preparation module processes:
- the historical lead time data into a processed historical lead time dataset;
- divide the processed dataset into a first portion of data points and a second portion of data points, the first portion consisting of more than 50% of the data points, the second portion consisting of less than 50% of the data points;
- train each of a plurality of machine learning forecasting algorithms on the first portion and subsequently test each of the plurality of machine learning forecasting algorithms on the second portion;
- select that forecasting machine learning algorithm that has a greatest accuracy in testing the second portion;
- retrain the selected forecasting machine learning algorithm on the processed historical lead time data;
- use the selected forecasting machine learning algorithm to forecast future lead times of the supply chain;
- and
- upload the future lead times to the database;
- and wherein:
- the specific instructions further allow for:
- separation of the historical lead time into groups;
- and processing of the future lead times:
- wherein execution of the specific instructions causes the processor to:
- receive from a user, tolerance criteria for separation of the historical lead time data into a plurality of tolerance zones based on median absolute differences between actual lead time data and historical planned lead time data;
- prior to any up-to-date change in the historical lead time data, separate the historical lead time data into the plurality of tolerance zones;
- and
- prior to any up-to-date change in the historical lead time data, replace future planned lead times by the future lead times in accordance with an action criterion defined by the user for each tolerance zone.
28 more elements
A computer-implemented method comprising:
- receiving:
- historical lead time data of a dynamic supply chain planning system;
- weather data;
- and economic indicators data from one or more databases;
- processing the historical lead time data by removing outlier data;
- extracting a plurality of source locations, destination locations and shipment dates from the historical lead time data;
- extracting a subset of weather data from the weather data based on the source locations, the destination locations and the shipment dates;
- extracting a subset of economic indicators data from the economic indicators data based on the source locations, the destination locations and the shipment dates;
- preparing a processed dataset based on the processed historical lead time data, the subset of weather data and the subset of economic indicators data;
- accessing a machine learning forecasting module;
- when accessing the machine learning forecasting module:
- dividing the processed dataset into a first portion of data points and a second portion of data points, the first portion consisting of more than 50% of the data points, the second portion consisting of less than 50% of the data points;
- training each of a plurality of machine learning forecasting algorithms on the first portion and subsequently test each of the plurality of machine learning forecasting algorithms on the second portion;
- selecting that forecasting machine learning algorithm that has a greatest accuracy in testing the second portion;
- retraining the selected forecasting machine learning algorithm on the processed historical lead time data;
- using the selected forecasting machine learning algorithm to forecast future lead times of the supply chain;
- uploading the future lead times to the database;
- and the method further comprises:
- receiving from a user via a user interface, tolerance criteria for separation of the historical lead time data into a plurality of tolerance zones based on median absolute differences between actual lead time data and historical planned lead time data;
- prior to any up-to-date change in the historical lead time data, separating the historical lead time data into the plurality of tolerance zones;
- and
- prior to any up-to-date change in the historical lead time data, replacing future planned lead times by the future lead times in accordance with an action criterion defined by the user for each tolerance zone.
19 more elements
Dependencies are inferred from the claim text.